Copyright © Tim Colley  |  All Rights Reserved

Contact Us

MGC Pure Chemical America

Chemical Storage Warehouse

( Completed 11-1-12 )

Mesa, AZ - 12,500 SF - Construct 12,500 SF 50’ Tall Warehouse to house chemical storage. New site development, utility infrastructure, and loading docks. Construct a 42 stall Isotainer parking lot. Construction of a new 27’ x 1000’ concrete wash channel to redirect a current 404 wash through the existing site.

(Dick and Fritsche Architects, GF Structural, Wood Patel, Adams & Rowley Engineering)

    WAREHOUSE​

MGC Pure Chemical America - Design Build

​New Pipe Rack and Chemical Tank Overhead Door 

( Completed 11-1-15 )

Mesa, AZ - New steel pipe rack bridge for new process piping. Install new structural framing to install new overhead chemical tank trailer door access.

MGC Pure Chemical America- Design Build

( Completed 12-1-15 )

Demolition and Renovation of Existing Precast Tile Warehouse

Mesa, AZ - Demolition of Tilt Panel and precast tee roof building. Install new structural framing to install new overhead chemical tank trailer door access.

MGC Pure Chemical America – Design Build

Drum Warehouse

5,740 SF - Shell construction tilt panel and precast tee roof structure. Built for chemical drum storage warehouse which required containment floors and overflow fire water retention pits.

( Architect – Dick & Fritsche Design Group )

Main: 480-455-0199
tim@colleyconstructionaz.com​