MGC Pure Chemical America

Parking Lot and Canopies (24 Stalls)

(Completed 8-1-15)

Mesa, AZ - Construct new parking stalls out of existing retention basin, Install new retaining structure. Includes grading of existing retention basin to create new spillways allow drainage to existing wash. Install new carports over new and existing stalling. Salvage native trees and light poles and relocate.

MGC Pure Chemical America

Isotainer Parking Lot , Precast Bridges 58 Stalls. 

(Construction 2-1-14)

Mesa, AZ - Construct 58 new parking stalls from existing 5 acres of desert. Includes grading of desert to create new retention basin, precast bridges, asphalt parking lot, storm drain and fire hydrant, custom wrought iron and CMU perimeter fence, light poles and cameras.

(DPA Architects, Atwell, Rowley Engineering, Bakkum Noelke Structural)

SITE DEVELOPMENT 
AND
PARKING LOTS

MGC Pure Chemical America

Isotainer Parking Lot (42 Stalls)

(Completed 11-1-12)

Mesa, AZ - Construct 42 new parking stalls. Includes grading of existing retention basin to create new spillways allow drainage to existing wash. New Light poles, cameras.

(Dick and Fritsche Architects, Rowley, Adams Engineering, GF Structural)

MGC Pure Chemical America

Parking Lot and Canopies (60 Stalls)

(Completed 3-1-11)

Mesa, AZ - Construct 28 new parking stalls out of existing retention basin, Includes grading of existing retention basin to create new spillways allow drainage to existing wash. Install 50 new carports over new and existing stalling. Salvage native trees and light poles and relocate.

(Dick and Fritsche Architects, Meade Engineering, Pearson Engineering, GF Structural)

Arizona Bank and Trust

Parking Lot Renovations 

(Completed 2015~2016)

Mesa and Chandler, AZ - Replace asphalt parking lot and slurry seal and stripe parking lot.

MGC Pure Chemical America

Parking Lot and Canopies (24 Stalls)

(Completed 12-1-15) 

Mesa, AZ - Construct new parking stalls out of existing retention basin, Includes grading of existing retention basin to create new spillways allow drainage to existing wash. Install new carports over new and existing stalling. Salvage native trees and light poles and relocate. 

Canyon State Academy – Rite of Passage

Queen Creek, AZ – Phase 1

2,000 LF of Decorative CMU Wall 

Excavation and backfill of 2,000 LF of new column and fence footings, 64 decorative split face 2’x2’ Columns, 106 H Columns and 2,000 LF of Split Face and Standard integral custom colored fence block. Includes precast integral colored column and fence caps. Integral colored column medallions. Steel Rite of Passage Logos, Custom Decorative metal Fence panels, vehicular, fire access and pedestrian gates. (EPS Group)