Ice King - Design Build

(Completed 12-31-13)

Ice Production Plant - Added Ice Machine

Phoenix, AZ Install new ice machine includes compressor, coiling tower, housekeeping pads, roof, cooler, MPE removal for new ice machine to be craned into new HK pad.

(Colley Designs, Rowley Engineering, Lam Engineering)


     MANUFACTURING

MGCA Pure Chemical America

(Completed 12-1-15)

Chemical Tank Mezzanine

Mesa, AZ - Construction of new steel mezzanines for Isotainer Chemical Tankers

MGCA Pure Chemical America

(Complete 12-1-13)

Building Infrastructure Renovations and Projects Mesa, AZ - Construction of new chemical double containment holding ponds, new tank house Keeping pads and epoxy coatings, asphalt overlay projects.

Ice King - Design Build

(Completed 8-1-11)

Shell - Ice Production Plant

10,000 SF

Phoenix, AZ Construct ground up 22ft tall cold storage building for an enclosed ice bin and ice machine room, new main building sewer system, ammonia refrigeration system. Renovation of existing cold storage building. Include cladding all existing walls with FRP.

(Colley Designs, Manarch Design, Air-Zona, Lam Engineering)