Copyright © Tim Colley  |  All Rights Reserved

Contact Us

MGC Pure Chemical America

(Completed 5-1-15)

Site Improvements and New Guard House

Mesa, AZ - Fill retention basin and relocate. Install new guard house and new truck access gate, new asphalt.

ISOS

(Completed 8-1-2013)

Tenant Improvements

1,000 SF

Tempe, AZ - Renovation of existing office space. Includes new light fixtures, bar top kitchen, new fixtures, wall paint and ceiling rework, custom daisy cake signage.

(Katz Design, Michael Hall Arch)

  COMMERCIAL AND OFFICE

Barry Metals Corp

(Completed 1-3-11)

Building Renovation

8,200 SF

Phoenix, AZ - Foam roof replacement, replace all windows, replace overhead coiling doors, new R30 deck insulation and cap sheet, repaint entire building.

Barry Metals Corp

(Completed 11-1-2012)

Building Renovation

10,000 SF

Phoenix, AZ - Office Warehouse Building Renovation Renovation of existing manufacturing building to create a new metal storage warehouse. Included new flooring, lighting, evaporative cooling, full cosmetic upgrade to paint, flooring and finishes.

Bizarre Wood Products Manufacturing – Design Build

(Completed 2007)

Shell and Tenant Improvements

7,000 SF

71st Glendale, AZ -  New wood cabinet production facility. New split faced masonry building included underground storm drain system, full domestic utility infrastructure, wood panelized roof structure, foam roofing, overhead doors, dust collector system, concrete parking lot and city street improvement for new utility taps. Interior included new restrooms, office, and open air mechanical and electrical drops for all the millwork equipment.

(Winton Architects, Hawkins Design Group, Bakkum Noelke Structural)

MGC Pure Chemical America

(Completed 4-25-11)

Only 3.5 Month Build

Shell and Tenant Improvements

4,500 SF

Mesa, AZ

New Office Building consisting of site improvements, metal framed structure with metal wood panel wall and soffits, full curtain wall window system with extension eyebrow fins. Interior wood wall and ceiling panels. Floating glass openings, acid stained flooring and floating ceilings providing a state of the art look.

(Dick and Fritsche Architects, Meade Engineering, Pearson Engineering, GF Structural)

MGC Pure Chemical America

(Completed 5-15-15)

Shell and Tenant Improvements

7,000 SF

Mesa, AZ  - New Office Building expansion consisting of site improvements, metal framed structure with metal wood panel wall and soffits, full curtain wall window system with extension eyebrow fins. Interior wood wall and ceiling panels. Floating glass openings.

(Dick and Fritsche Architects)

SPER Scientific

(Completed 5-1-2013)

Tenant Improvements

5,000 SF

Scottsdale, AZ -  Complete demolition of two office suites. Construct a new class A office and warehouse. Included all new walls, custom glass offices, restrooms, kitchen, exposed and floating ceilings, custom millwork lobby package.

(Katz Design, Michael Hall Arch, AME Engineering)

Main: 480-455-0199
tim@colleyconstructionaz.com​